一本大道香久在线播放_无码专区久久中文字幕_av中文字幕网免费观看_Av免费无码一区二区……

韓國JIINPOONG振動(dòng)耐磨試驗(yàn)機(jī)/三星振動(dòng)耐磨測試機(jī)/TC-15韓國振動(dòng)-強(qiáng)迫吊起來玩弄羞辱NP_快播免費(fèi)片毛網(wǎng)站

報(bào)價(jià)
¥178000.00元每
聯(lián)系手機(jī)
13418984037
加工定制
是
品牌
韓國
型號(hào)
TC-15(SS1502)
簡單介紹
韓國振動(dòng)機(jī)拋光機(jī)此款機(jī)器三星,lg等一系列手機(jī)電子廠的噴涂工藝檢測.檢測手機(jī)電池背蓋,手機(jī)按鍵.手機(jī)導(dǎo)航件.手寫筆.聽筒絲網(wǎng).手機(jī)框.等一系列噴涂所需檢測。

韓國振動(dòng)機(jī)拋光機(jī)

   的詳細(xì)介紹
產(chǎn)品名稱:韓國振動(dòng)拋光機(jī) 詳細(xì)介紹:韓國振動(dòng)機(jī)拋光機(jī)韓國振動(dòng)機(jī)拋光機(jī)
 first of all, thank you for buying one of ourmachines.
 
   we are producing vibratory finishingmachines, vibration applied machines, precision processing specialmachines with our accumulated technology and thorough under our motto that we serve our customers with the best products
.
 we would like to introduce, through this manual, how to properlyuse the machine, to perform its best function in operation that ourdevelopment and production team have made with theirendeavors.
 
 this manual will guide the users to understand the e, howto use in the best conditions, how to increase productivity, how tomaintain the e in the very simple way.
foranything that is not sufficiently described, please feel free tocontact our office, then we will supply with further informationthat we can do.
 
   we hope this e will do agood role in your business, good luck!
 
                     fromall the members of jin poong b.r. tech.
 
 
warranty
 
1.warraty period of this e is 1 year or2000 hours whichever comes first. and warranty period of theelectrical parts is 6 months.
 
 this is based on the normal operation,operator’smistake or mishandling of the e, excessive operation beyondits capability and failure to maintain on time will release thewarranty obligation.
 
2. inany case that the user has changed the machine parts or correctedwithout any prior agreement, this warranty will beinvalid..
 
 painting durability tester machine
             model  :  tc - 15 (sm - 1502)
 
i.  composition of thee
1.vibratory tumbler
2.sound cover
3.auto water & compound supply system
4.control unit
   
ii.  specification of thee
   1. vibratory tumbler
   tub interior dimension:  w180mmx l530mm
    in-put area dimension: w130mm x l530mm
   lining : hot pour polyurethanecasting, thickness: 15mm
   motor  : 220v x 1hp x 3ph x60hz. (2 pole)
   motor r.p.m : 3500
 2. sound cover
   l920mm x w620mm xh900mm+120mm
   top door with gascylinder
 
3.auto water & compound supply system
   water tank, metered to be500ml
   water tank, metered to be 1000ml +addition of compound 200ml
   water tank, metered to be 500ml +addition of compound 20ml
   compound metering pump 300ml/min,adjusted to supply 200 ml by a timer.
   compound metering pump 20ml/min,adjusted to supply 20 ml by a timer.
 
iii.utility re
    1 electrical power:  220vx 1ph (20a). 
    2 tap water:  4l/hr. (tobe linked to the  right side of the  control unitby  8mm hose.)
 
iv.installation
 
            just place onthe flat concrete floor without any anchoring.
incase the e is not horizontally leveled, the mass in thetumbler can move to a side,
pleasebe careful.
 
            please link 3 wires from the motor to the u.v.w. terminal in thecontrol box.
            please link 2 wires from the mainsource of electrical power to the r.t. terminal in thebox.
       
            please link tap water to the supply valve on the right side of thecontrol box by 8mm hose.
            in case tap water contains some foreign substance, please installpre-filter before this hose.
            please link a hose(20mm) from thehose nipple on left side of the control box to the mainmachine.
            a little longer hose is shipped with machine, please cut it off andadjust depending on
thesite allocation
       
.           please link the discharge valve on the rear side of machine to thelaboratory discharge pipe line.
            please leave the dischargevalve always open except for the maintenance.
            a compoundcontainer needs to be placed in the room under the controlbox.
            please remove the top lid and place the container in the room andput a separate lid pre-drilled
on 3places, 1 big hole in the center and 2 small holes on the right andleft.
            on the center hole, please place a level sensor which emit alarmwhen there is not enough
compound in the container,
and onthe right and left holes insert 2 hoses that come from the meteringpumps.
       
 
v.operation
 
   supply the control box with power(put the breaker switch on, put the disconnect switch on)and
putthe selector switch on, then you will have light on the powerlamp.
 fill the vibratory tumbler with media 15l(11.25l of cone and 3.75l of pyramid).
 
putthe mode to manu and push on start.
if themass turns from front to back, the motor direction iscorrect.
incase it turns in the opposite direction please correct by changingthe wire.
 
1.    preparation course
themedia contains some flashes and burrs. this course is, prior to themain course of testing, 
tocondition the media by tumbling to the right purpose of thetesting.
 
                 firstof all, put mode to manu and push on pre water-1, then 500ml tankwill be filled with water.
                 pls push on only once, if you push on twice it will bestopped.
o                once it is full, it will be automatically disconnected. when thewater is evacuated, the tank
 is automatically refilled, therefore fromnext time, there is no need to put to manu and fillagain.
.
            set the timer 4 hours or 10 hours as required by your company(currently designated to be 10 hours).
            put mode to pre and push on start then thetumbler will start to run and 2000 ml of water
willbe supplied automatically.(4 times of 500ml)
                 at thetime of start, 2000ml will be supplied and 500ml will be suppliedevery 30 min. automatically.
 
 the tank always keeps water 500ml. and supplies when it isre
 
2.main course of testing
   
thiscourse is to test whether the testing parts are safe or damagedwhen the media and parts
haverubbed each other in the vibratory tumbler.
       
firstof all, put mode to manu and push on main water-1, then water willbe ready with 1000ml
in thetank 1, push on main water-2 then water will be ready with 500ml inthe tank 2.
                 push on comp-1, then 200ml of compound will be added to 1000ml ofwater  in the tank-1.
            push on comp-2, then 20ml of compound will be added to 500ml ofwater in the tank-2.
 
             pls push on only once, if you push on twice it will bestopped.
             once you have filled for the first time, when the liquid isevacuated, it is made again automatically
therefore there is no need to do manuallyagain.
            set the timer 1 hour or 2 hours as required by yourcompany.
            put the mode to manu and start the machine, then 1000mml of waterand 200ml of compound
willbe automatically supplied in the beginning and 500ml of water and20ml of compound
willbe supplied every 30 min.
        
 (note) when there is not enough compound,you will have alarm light on the control panel,
pleasefill the container with compound.
 
       vi.maintenance
 
            in case the inverter inside the control box repeats to trip,one of the 3 wires from the motor
mighthave been disconnected by the vibration. please take out thevibratory tumbler from the
soundproof box and disassemble the drain pipe lines and lift up the tuband check the wires
fromthe motor. if any of the wires were disconnected, please correctit.
 
incase there is any loud noise from the vibratory tumbler, thebearings on the motor must have
broken, please replace them referring to theassembly drawing of the motor.
 
incase the liquid of water and compound is not supplied well, someforeign substance might have
beenstuck in the ball, please clean the valve referring to the separatemanual.
 
 in case compound is not well injected fromthe metering pump, please clean the balls on the
suction and discharge port of the diaphragmpump.
(referring to the separate manual, pls clean partno. 2,3,4.)
thismay happen after long holidays.
 
pleaseclean the filter that is installed right after the in-put watervalve on the right side of
thecontrol box.
 
vii.warranty & free replacement
   we warrant for either 380days from the date of shipment or 2000 hours ofoperation,
whichever comes first. in case any part does notwork properly, we send replacement part only.

本產(chǎn)品的加工定制是是,品牌是韓國,型號(hào)是TC-15(SS1502),測量范圍是手機(jī)電子廠的噴涂工藝檢測.檢測手機(jī)電池背蓋,手機(jī)按鍵.手機(jī)導(dǎo)航件.手寫筆.聽筒絲網(wǎng).手機(jī)框.等一系列,磨擦頻率是60Hz,測量行程是MotorR.P.M:3500(mm),機(jī)臺(tái)尺寸是L920mmxW620mmxH900mm+120mm(mm)

統(tǒng)一社會(huì)信用代碼
440301107401620
成立日期
2013年06月04日
法定代表人
黃慶華
注冊(cè)資本
50萬元人民幣

主營產(chǎn)品

光學(xué)計(jì)量標(biāo)準(zhǔn)器具;電子產(chǎn)品;UV能量計(jì);張力計(jì);耐磨試驗(yàn)機(jī);鉛筆硬度計(jì);粘度計(jì);測試耗材;百格膠;環(huán)境測試試驗(yàn)機(jī)

經(jīng)營范圍

儀器儀表、電子產(chǎn)品及相關(guān)耗材、機(jī)電設(shè)備的技術(shù)開發(fā)與銷售;國內(nèi)貿(mào)易;經(jīng)營進(jìn)出口業(yè)務(wù)。

公司簡介

      深圳歐普瑞檢測設(shè)備有限公司是一家專業(yè)從事研發(fā)、生產(chǎn)以及銷售塑膠五金產(chǎn)品品質(zhì)檢測設(shè)備的公司。所涉及的領(lǐng)域包括塑膠五金、手機(jī)可靠性檢測設(shè)備、涂裝檢測設(shè)備、自動(dòng)化設(shè)備。專業(yè)提供實(shí)驗(yàn)室規(guī)劃方案、檢測設(shè)備的配置、專業(yè)技術(shù)的培訓(xùn)。歐普瑞集研發(fā)、生產(chǎn)、銷售、維修一體化服務(wù)公司,以雄厚的技術(shù)實(shí)力、竭誠為您服務(wù)。     憑借10年的工廠實(shí)戰(zhàn)經(jīng)驗(yàn)和不斷掌握核心技術(shù),贏得了廣大客戶的一致好評(píng),并成為多家世界500強(qiáng)企業(yè)指定的合作伙伴。公司秉承“...

查看公司詳情
聯(lián)系電話13684910389撥打手機(jī)13418984037撥打郵箱[email protected]郵件
聯(lián)聯(lián)系人張燦連
地址深圳市寶安區(qū)石巖街道田心新村24巷9號(hào)首層
我們其他產(chǎn)品